This was a design-build project whose objective was to improve the energy efficiency of the Consulate compound. Johns and Bhatia Engineering Consultants completed the design of a large steel frame structure over a parking lot to support solar panels. The structure has an area of approximately 500 square meters (5,380 square feet) and consists of steel I beam framing supported by vertical posts.